New construction of an administration building combines wood and concrete
Timber hybrid construction - environmentally friendly and quickly built at the same time
In the new construction of the company headquarters at the old-established company location, emphasis was placed on the design and execution to reflect the company's range of services from timber to reinforced concrete construction. The new administration building offers around 50 employees an inviting reception area, bright and spacious offices with a view of the greenery, various meeting rooms and communicative lounge areas.
Configuration overview
Components used
LIGNO® Acoustic light | Ceiling cladding
Produktkode: LIGNO® Acoustic light 3S_33_a70g_625-20-4_EI_gb_b0Wood type
Various wood species are available for the visible layer. For quality reasons, individual wood species cannot be configured for all profiles; for technical reasons, surface treatments are excluded for some wood species.Wood type
_EI Oak knotless
Profile
The visible layer is profiled with joints. The code for profiling indicates in millimetres: Element width, strip width (rounded, from/to if applicable) and joint width (rounded) as well as a letter identification for variants, e.g. with chamfered strip edges or with additional height gradation.
Note: Some profiles indirectly cause exclusions for other configuration options.Profile
_625-20-4 Slat profile
Structure
The face is subjected to a brushing _gb as standard, which produces a stronger or weaker structure depending on the type of wood and makes the surface less sensitive to scratches. Alternatively, a smooth sanding _gs can be carried out, or on request a bandsaw cut _grimitated.Structure
_gb Brushed
Treatment
Depending on the type of wood, the optional application of a surface treatment is possible ex works. Individual colour finishes are always sampled for coordination. For elements in individual lengths, colour treatment is limited to max. 5 m length.Treatment
_b0 Untreated
Room acoustics
If the soffit of the element is to have a good sound-absorbing effect, the penultimate layer is configured as absorber _a50g. Otherwise, this layer is configured as a solid wood layer _a0.Room acoustics
_a70g 70 % Absorber
Reference-related
Downloads
Project participants
Hetterich Architekten BDA
Panter Holzbau GmbH
Austraße 123
97222 Rimpar
www.panter-holzbau.de
Related references
ASI Reisen Alpinschule Innsbruck
The Swedish-Tyrolean architects Snøhetta designed the new company headquarters for the tour operator ASI ...
6020 AT-Innsbruck
ViewOffice building Fohhn Audio AG
Noisy disturbances are part of everyday office life. With the LIGNO® Acoustic light...
72622 Nürtingen
View